Settings for Disaster Recovery schedules

If you choose Disaster Recovery schedules, you need to configure the following settings.
Start Time
Click the drop-down arrow to select the desired start time to perform the operation. To create a start time that does not begin on the hour or half hour, type the time in the field. Be sure to type
AM
or
PM
after a time you enter manually.
Recurrence Pattern
Select how often you want the operation to run. The default option is set to
Daily
.
  • Hourly
    Specify the interval at which the operation will run in hours and minutes.
  • Daily
    Specify the interval at which the operation will run in days (for example, every day or every three days).
  • Weekly
    Select the interval in weeks to run the operation, and then select the desired days on which the operation should be run. To save time, you can
    Select All Days
    . To clear all days and select just those that you want,
    Deselect All Days
    first. If you click
    Deselect All Days
    and do not select any days, the schedule will not run.
  • Monthly
    Set the
    Day
    of the month on which to run the operation. You can specify a specific date (like the 15th of every month) or a certain day of the week (like the last Friday of every month).
Maximum Runtime
Select or enter the maximum time the operation should run in hours and minutes. If the operation does not complete within that time, the operation fails. If failures appear in your FactoryTalk AssetCentre Event Log, you may need to increase the number of agents to perform scheduled operations. The default value is set to 1 hour.
Provide Feedback
Have questions or feedback about this documentation? Please submit your feedback here.
Normal