Change asset settings for the schedule

You can configure the asset settings for the schedule. The asset properties you modify here only affect the schedule-related settings for the asset included in this schedule.
To change asset settings for the schedule
  1. In the tree on the left side of the dialog box, select the asset containing the operation properties you want to change.
  2. On the right side of the dialog box, change the operation properties as desired.
  3. To restore the asset's operation properties to their previous values, click
    undo
    .
  4. To save the modified operation properties, click
    save
    .