Move or copy a controller

For projects in the same database,
Copy To
and
Move To
allow you to copy or move a controller from one project to another project from the
Class View
pane.
TIP:
This feature is only available if the product has a Standard activation license and is not available in Lite mode.
To move or copy a controller to another project
  1. In the
    Class View
    pane, expand
    Controllers
    .
  2. Right-click the controller that will be copied or moved to another project.
    • Select
      Copy To
      .
      When selecting
      Copy To
      , the controller will be copied and pasted to the destination project.
    • Select
      Move To
      .
      When selecting
      Move To
      , the controller will be cut and pasted to the destination project. When the controller has unresolvable references, they will be cleared.
  3. In Select Destination Project, select an existing project or create a project as the destination project.
    When there is a name conflict between the moved controller and the controller in the existing project, rename the destination controller in
    Rename Destination Controller
    .
  4. Click
    OK
    .
    • When prompted, select
      OK
      .
    • Once the
      Log File Viewer
      opens, track the errors, warning, informational, and debug events.
Provide Feedback
Have questions or feedback about this documentation? Please submit your feedback here.
Normal