Store a Project While the System is Running
To store your controller project in nonvolatile memory while your redundant system is running, complete these steps.
- Access the RMCT.
- Verify that the redundant chassis are synchronized.
- On the Configuration tab, set Auto-synchronization to Never.
- On the Synchronization tab, select Disqualify Secondary.
- Go online with the secondary controller.IMPORTANT:Do not go online with the primary controller until you have completed this procedure.
- In the Logix Designer application, access the Controller Properties dialog box and select the Nonvolatile Memory tab.
- To store the project in nonvolatile memory, select Load/Store then <--Store.
- Access the RMCT.
- On the Synchronization tab, select Synchronize Secondary and wait for the system to synchronize.
- Select Initiate Switchover.
- Go online with the new secondary controller.
- To store the project, complete step 6 and step 7.
- On the Configuration tab of the RMCT, set Auto-synchronization to your preferred setting.
- On the Synchronization tab, select Synchronize Secondary.
Provide Feedback