Respond to a material phase binding prompt

Material phase binding prompts are displayed when the operator has set up prompted binding for material phase/container pairs. Respond to the binding prompts to select a material phase/container pair when the recipe is running.
To respond to a material phase binding prompt
  1. Select
    Batches
    .
  2. Select a batch.
  3. In the
    Batch Detail
    display, select
    Start
    to execute the recipe.
    The recipe is running, and a prompt alert is displayed.
  4. Navigate to the
    Prompts
    list and select the material phase binding prompt for the recipe that is running.
  5. Select a material phase/container pair from the list.
  6. Select
    Acknowledge
    FTBV_AcknowledgeIcon.
Provide Feedback
Have questions or feedback about this documentation? Please submit your feedback here.
Normal