Select phases

Select phases on the
Synchronize with Logix5000: <data server name>
dialog box.
To select phases:
  1. The left pane of the
    Synchronize with Logix5000: <data server name>
    dialog box displays the phases in the project assigned to the selected data server. Only phases that exist in the
    Logix Designer
    project, but not in the area model display under
    Logix Designer-only Equipment Phases
    .
    TIP:
    If other phases assigned to the selected data server exist in the area model but not in the project file, or are different from those in the project file, they also display in the left pane beneath the area model name, within their units.
  2. Select a phase to create in the area model.
  3. Select the
    Resolution
    box for the selected phase and select
    Create in Area Model
    .
    TIP:
    If the only
    Resolution
    available is
    Cannot Synchronize
    , select
    Details
    to see a message that explains why the phase cannot be synchronized. (See
    View synchronization issues
    for more information.)
  4. (optional) To view the selected phase configuration in
    FactoryTalk Batch
    and in
    Logix Designer
    , select
    Details
    to open the
    Equipment Phase Synchronization Details
    dialog box.
    Select
    Close
    when done viewing the phase details.
  5. Repeat steps 2 - 4 for each phase in the area model.
  6. On the
    Synchronize with Logix5000:<data server name>
    dialog box, select
    Synchronize
    . The
    Select Phase and Unit
    dialog box opens.
  7. Name the new phase instance. You can use an existing phase class or provide a name for a new phase class and then select a unit to assign the new phase instance.
Next, associate the new phase with an equipment phase and select a unit to contain it in the area model. Select an existing phase class in the area model or create a new one.
  • To associate the phase with a phase that exists in the area model, continue on to Select a phase and unit to synchronize.
  • To create a new phase in the area model to associate with the phase, skip to
    Create a new phase and select a unit
    .
Provide Feedback
Have questions or feedback about this documentation? Please submit your feedback here.
Normal