Verify controller tags
Tag verification checks that tags in a
View Designer
project are present in the referenced controller projects. Verification for tags occurs automatically upon downloading a project. Verify tags any time during project development. For example, verify tags after defining controllers for a project. The Errors
window shows the results.An invalid tag reference shows as a warning. The project may work when downloading the project to an HMI device after fixing the tags in the controllers using
Logix Designer
. Resolving warnings is not required to download a project. To verify controller tags
- On theMenubar, selectProject >Verify Project. TheVerify Projectdialog box opens and verification begins.
- If there are invalid tags listed in theErrorswindow, double-click an entry to navigate to the source of the warning in the project, and make the necessary changes.
- Repeat the verification process until there are no warnings listed in theErrorswindow. The list updates each time the verification process runs for the project.TIP:Tips:
- Alternate methods of navigating to the source of a warning in theErrorswindow:
- Click the hyperlink in theLocationbox.
- Select a warning in the list and pressEnter.
- Alternate methods of starting the verification process:
- In theProject Explorer, right-click the project nameVerify Project.
- On theStandardtoolbar, clickVerify Project.
Provide Feedback