Configure a sparkline
    Configure the source of the data to display in the Sparkline object. Adjust the Sparkline object properties.
- InProject view, right-click a node to contain theSparklineobject and select .
 - InProperties, create a dynamic link betweenPen valueand a node or database from which you want to obtain the data.For more information about dynamic links, see Create dynamic links.
 - (optional) Configure the sparkline properties:
- Pen color. Sparkline pen color.
 - Pen thickness. Sparkline pen thickness.
 - Time window. Sparkline time range.
 - Refresh time. Sparkline refresh time.
 - Y-axis maximum. Maximum value of the Y-axis.
 - Y-axis minimum. Minimum value of the Y-axis.
 - Range high. High value of the range.
 - Range low. Low value of the range.
 - Range color. Range background color.
 
 
Provide Feedback