Schedule an axis

Schedule axes in a Motion Scheduler to define their update timing and assign them to schedule groups.
Prerequisites
  • A Motion Scheduler is created.
  • Axes are added to the project and allocated to a controller and a Motion Control Group.
To schedule an axis
  1. On the explorer bar, select Execution Icon
    Execution
    .
  2. Expand the controller, expand the
    Motion
    folder, and then select the Motion Scheduler.
  3. In the
    Properties
    pane, select the
    Axis Schedule
    tab.
  4. Select
    Schedule Axes
    .
  5. In
    Schedule Axes
    , configure the scheduling settings.
    • Select the
      Base
      update period.
    • (optional) Select the
      Alternate 1
      and
      Alternate 2
      update periods.
      TIP:
      The Alternate update period must be a multiple of the Base update period.
    • Select one or more axes.
    • Select
      Schedule
      under the desired schedule group.
    For more information, see Schedule Axes dialog.
  6. Select
    OK
    .
Provide Feedback
Have questions or feedback about this documentation? Please submit your feedback here.
Normal