Command a step or
Equipment Phase
using the Sequence Detail Control

Command an
Equipment Phase
through a step using the Sequence Detail Control.
TIP:
Select
Active Step Change
L5K_SILC_initializetags_icon_V25 to make a step active.
Before you begin
  • Open a display that contains the Sequence Detail Control.
  • The
    Equipment Sequence
    must be in
    Manual
    mode.
  • The step to be commanded must be active. This implies the step is attached to the
    Equipment Phase
    to be commanded.
To command a step using the
Equipment Sequence
Monitor, see
Steps: Command a Step or Equipment Phase
Provide Feedback
Have questions or feedback about this documentation? Please submit your feedback here.
Normal