Add Work Units Node

Offers granular insights into energy usage at the work-unit level. It enables precise tracking of energy consumption for individual machines or processes, facilitating targeted energy-saving actions and maintenance planning.
NOTE:
The following points are required to view data on
Work Units level dashboard
:
  • Data from different meters which are directly connected to a Work Unit node will be considered for the data aggregation.
  • For consumption and demand charts, the respective resource meter has to be configured with the proper tag mapping.
  • For Cost charts, the respective rate schedule should be configured at the Site level.
  • For Emission, the respective emission factor should be configured at the Site level.
  • For Production and energy intensity charts should have correct tag mapping for production count measurement.
  • Harmonized units are defined at the Enterprise level and will be used to display harmonized consumption, intensity, or emissions data.
Perform the following steps to add Work Units:
  1. Select
    Area
    or
    Work Center
    from the hierarchy list.
  2. Click the [] icon and click
    Add
    .
    Work Center - Add
    The
    Add Component
    dialog is displayed.
    Add Component
  3. Under
    Node
    from the left pane, select
    Work Units
    .
    Add Component - Work Unit Dialog
  4. Provide the following details:
    • Type
      : Select a Work Units type from the drop-down list.
      Work Units Types
    • Name
      : Provide a Work unit name.
    • Description
      : Provide a description of the Work Unit.
  5. Click
    Add
    .
    The "
    <Work Units Name> added under the <Work Center Name> successfully
    " message is displayed.
  6. To edit the base details and set the notification, refer to the Edit Component and Notification Configuration sections.
    Area
Related Information
:
Provide Feedback
Have questions or feedback about this documentation? Please submit your feedback here.
Normal