Duplicate a Program Organization Unit
In
Project Organizer
, copy and paste a Program Organization Unit (POU) to duplicate it in the same or between different FactoryTalk Design Workbench sessions, especially when you have similar POUs. The pasted POU will have a number appended to it if a POU with the same name exists.
TIP:
- The pasting action pastes the latest version of the copied POU. Once a copied POU is pasted, any further edits won't update the pasted POU.
- It is not supported to copy a program to a user-defined function block (UDFB).
- It is not supported to paste a copied POU after it has been deleted.
Prerequisites
- The controller is offline.
To duplicate a POU
- InProject Organizer, right-click the POU, and then selectCopy.
- Right-click the node under which you want to paste the POU, and then selectPaste.
Provide Feedback