Material requirements: material and lot
The use of lots in the material requirement further narrows down the unit and equipment modules selected for binding.
Example
- MBR_ADD:1 requires an addition of Material_1, Lot_5.
- MBR_ADD:2 requires an addition of Material_3, Lot_4.
- MBR_DUMP:1 has no material requirements.
Unit 1 is selected because it can draw from the specified lots. Unit_2 can satisfy the materials but not the specified lots.
Container_3 is a plug-flow container so the controller IDs determine which sublot is drawn from the container. Lot_4 has a smaller controller ID than Lot_8 so Lot_4 must be used first.