Install Reinforcement Hardware—Seismic Installation Frame 7
- Follow the instructions for removing the LCL filter and power modules to gain access to the cabinet interior.
- Position the reinforcement hardware as shown.
- Secure the reinforcement hardware to the vertical enclosure rails by using 12 M5.5 x 13 mm self-tapping screws.IMPORTANT: If any of the mounting holes in the vertical rails are stripped during installation, replace the fastener with a M6 x 12 mm Torx screw provided with the kit. Final torque: 4.75 N•m (42 lb•in).
Provide Feedback