Schedule an axis
Schedule axes in a Motion Scheduler to define their update timing and assign them to
schedule groups.
Prerequisites
- A Motion Scheduler is created.
- Axes are added to the project and allocated to a controller and a Motion Control Group.
To schedule an axis
- On the explorer bar, select
Execution. - Expand the controller, expand theMotionfolder, and then select the Motion Scheduler.
- In thePropertiespane, select theAxis Scheduletab.
- SelectSchedule Axes.
- InSchedule Axes, configure the scheduling settings.
- Select theBaseupdate period.
- (optional) Select theAlternate 1andAlternate 2update periods.TIP:The Alternate update period must be a multiple of the Base update period.
- Select one or more axes.
- SelectScheduleunder the desired schedule group.
For more information, see Schedule Axes dialog. - SelectOK.